Climate Adaptive Water Resources Management in the Aral Sea Basin

About the Project

Title: Climate Adaptive Water Resources Management in the Aral Sea Basin Project

Client: Center for Implementation of Foreign Investment Projects in Water Sector under the Ministry of Water Resources of Uzbekistan

Funding: Asian Development Bank

Start date: (month/year): 12/2022

Completion date: (month/year): 12/2028

Regions: Uzbekistan | Bukhara, Surkhandarya, Khorezm, Republic of Karakalpakstan

Infrastructure Modernization

Policy and Institutional Strengthening

Climate Change Resilience Building

Financing and Partnership Development

Project Description

The Climate Adaptive Water Resources Management in the Aral Sea Basin Sector Project will deliver climate adaptive solutions for water resources management. It is an ADB loan for a proposed amount of $150 million and about $40.6 million to be provided by the government. The proposed project will undertake activities providing climate change resilience: (i) modernized main canal infrastructure to improve measurement, control and conveyance within existing systems; (ii) modernized inter-farm, canal systems and on-farm management including physical improvements for land and water management at the farm level and application of technologies for increased water productivity—for which suitable grant co-financing options will be considered; and (iii) policy and institutional strengthening for sustainable water resources management. This will include strategic support and capacity building to Ministry of Water Resources (MWR) and its provincial, basin and district agencies, and water consumers associations —for which suitable grant co-financing options with other development partners will also be considered.

Services Provided

01

Prepare the feasibility studies for selected subprojects in line with national regulations and requirements and climate change resilience objectives

02

Convertion of the feasibility study into the due diligence report required for ADB’s review and endorsement

03

Preparation of the detailed feasibility design and bidding documents for civil works on modernization of irrigation infrastructure

04

Project implementation, procurement, contract management and construction supervision (time-based inputs)

05

Assist PIU in managing and implementing the project and ensuring compliance with the project administration manual, the loan agreement, and the project documents

06

Preparation of the bidding documents for remaining packages of core-subprojects

07

Assist PIU in evaluation of bids for all procurement contracts under core and noncore subprojects

08

Provide technical oversight and guidance on technical aspects related to the civil works contracts, and capacity development of PIU staff in contract management and construction supervision

09

Act as an Engineer for civil works contracts, review and endorse contractor’s progress payment certificates, requests for contract variations, and other technical solutions as needed

10

Supervise the implementation of and monitor the compliances with environmental and social safeguards in line with ADB’ Safeguards Policy (2009), core labor standards (CLS) and compliance with Environmental Assessment and Review Framework (EARF), relevant Initial Environment Examinations (IEE) and Land Acquisitions and Resettlement Plans and Framework

11

Assist the PIU in project performance monitoring and evaluation in terms of achievement of outcome and outputs target indicators, and compliance with loan covenants

12

Review the Site-Specific Health and Safety Management Plan (SSHSMP) for the Project that is prepared and submitted by the Contractor. Then, make recommendation to the Employer in relation to the approval of the SSHSMP. Communicate the approved SSHSMP to all consultants and contractors throughout all project stages. Should any unforeseen events occur, review the updated SSHSMP and make recommendation to the Employer in relation to the approval of the SSHSMP

Submit CV for new projects